Project name: Raw Mill & Kiln line 3 Rehabilitation
- Design & Fabricate over fly cable rack
- Design the cable routing and replace the old cables
- Supply new Power & Control cables required for the rehabilitation
- Re-route existing Power & control cables from tunnel to the new cable rack
- Pull & Install the new cable through new cable rack
- Disconnect & reconnect the cables
- Testing the cables after installation
- Rotation, signal test & commissioning for RM & Kiln
- Start up & reliability test
Category
Automation, Instrumentation and Control Systems
Date
October, 2019
Status
Completed