image
image

Project name: Motors Bearing Replacement and Brushes Repair

  • Deinstallation of the motors power cables
  • Supervision of the dismantle of the motors and transfer it to workshop
  • Deinstallation of carbon brushes and brush holders
  • Deinstallation of the brush bridges
  • Replacement for DE Bearing
  • Replacement for NDE Bearing
  • Transfer the motor to site and install the motor back
  • Clean and adjust the brushes and the holders after installation
  • Manufacturing and install the table for slip ring portable lathe
  • Machining of the slip ring surface depending on the corresponding damages
  • Measurement of the roughness depth of the already treated slip ring
  • Measurement of the run out of the treated slip ring
  • Check and adjust if necessary, the liquid starter
  • Test run the motor decoupled
Category
Field Services
Date
March, 2021
Status
Completed