Project name: Installation of 25MVA Transformer for CM5

  • Dismantle the old busbar duct
  • Dismantle the old transformer HT Cables
  • Dismantle of the old transformer
  • Lifting out of the old transformer
  • Civil modification for the support rails
  • Connecting all parts for new transformer
  • Lifting up and installation for the new transformer
  • Connecting the HT side cables
  • Install the HT Side bushing
  • Connect the control cables
  • Connecting the OLTC Power and Control Cables
  • Connecting all sensor cables
  • Erection for new power cables tray from transformer to the switch gear infeed
  • Power cables 300mm single core termination and installation on transformer LT Side
  • Vacuuming the transformer to be ready for oil refilling
  • Filtration the oil by using filtration machine 6000 liter/hr
  • Refilling the transformer by oil
Category
Installation and Commissioning
Date
July, 2020
Status
Completed