image
image

Project name: Cooling Tower Services and Repair

  • Cleaning the external body of the cooling tower by high pressurized water in which the cement layers and dust will be demolished.
  • Open the valve of main tank for cooling water to avoid Kiln stoppage
  • Remove the heat exchanger sink at the bottom of the tower for cleaning and isolation
  • Remove the drift Eliminator at the top of the tower
  • Dismantle the louvers for cleaning and repair
  • Painting, Epoxy and isolation the internal body of the tower to protect from corrosion and increase the loss of cooling temperature inside the tower during operations
Category
Field Services
Date
January, 2018
Status
Completed