Installation MV Switch Gears for CM5
- Fabrication for new basement frame for new switch gears
- Disconnect all cables from CM5 switch gears and prepare them to be terminated at incomer panel.
- Dismantle the old switch gears for CM5
- Install the new basement frame
- Shifting of new Switchgears to Outdoor Substation
- Assembling of new gears
- Insulation testing for breakers and busbars
- Installation of the new switch gears of CM5
- Termination of cables to new switchgear
Category
Installation & Commissioning
Date
September, 2018
Status
Completed