Installation MV Switch Gears for CM5

  • Fabrication for new basement frame for new switch gears
  • Disconnect all cables from CM5 switch gears and prepare them to be terminated at incomer panel.
  • Dismantle the old switch gears for CM5
  • Install the new basement frame
  • Shifting of new Switchgears to Outdoor Substation
  • Assembling of new gears
  • Insulation testing for breakers and busbars
  • Installation of the new switch gears of CM5
  • Termination of cables to new switchgear